Active couriers
Couriers currently carrying active status.
MINVOLT / REAL-WORLD OPERATION
MinVolt bikes, the Dolu battery network and the operating platform are at work every day across Baku. Live counters show current operating volume; the historical results below cover a separate, fixed reporting period.
Updating live data
Couriers currently carrying active status.
Live all-time count since MinVolt began operating.
Battery swaps completed during the rolling 24-hour window.
Currently available for swapping across the Dolu network.
FIRST FOUR MONTHS
From our July launch through October, recorded riding activity and fleet participation increased across Baku.
Historical reporting period: 1 July–31 October 2026 · Asia/Baku · 123 calendar daysEstimated from validated GPS telemetry.
Measures bike movement—not courier shift length.
Distinct couriers with recorded distance during July–October.
Distinct bikes with recorded distance in the first four months.
MONTHLY PROGRESS
July through October 2026 — recorded distance, moving hours and bikes used during each month.
A TYPICAL DAY
Fleet-wide daily averages across the full 123-day reporting window.
km travelled per day
hours in motion per day
October versus July — related views of the same operating growth.
October versus July.
October versus July.
October versus July; not average daily active bikes.
RIDER REACH
Cumulative reach shows scale; monthly participation shows how each month was composed.
124 couriers recorded riding activity in multiple months.
| Month | Distance (km) | Moving hours | Bikes used in month | Monthly riders |
|---|---|---|---|---|
| July | 179,817.1 | 10,574.3 | 101 | 146 |
| August | 210,895.2 | 12,383.2 | 120 | 143 |
| September | 229,928.4 | 14,974.8 | 144 | 179 |
| October | 264,359.3 | 16,167.8 | 146 | 203 |
TYPICAL ACTIVE-BIKE PROFILE
Aggregated from regularly active MinVolt bikes during the first four months of operations.
Activity is concentrated in the afternoon and evening. Across the observed fleet, most riding and battery-swap activity took place between 12:00 and midnight, with the strongest riding hour around 19:00 and the highest swap activity around 20:00.
Overnight activity is retained: 13.8% of distance and 13.8% of swaps occurred between 00:00 and 06:00.
Median distance per active bike-day
Median moving time per active bike-day
Median distance between swap events
A typical active bike covered a median of 73.7 km and recorded 4.4 hours of movement during an active day.
Between consecutive battery swaps, the median recorded distance was 44.2 km. The interval between swaps includes both movement and non-moving time and should not be interpreted as courier rest.
Based on original operational archives for July–October 2026. Hourly shares represent aggregate GPS-derived riding distance and completed battery-swap events in Asia/Baku time. A typical active bike is defined here as a bike observed on at least 14 active days during the period. Values describe fleet-level patterns and do not represent every courier or every shift.
BAKU COVERAGE
Recorded riding activity density across Baku, shown as a hexagonal grid.
TOP CORRIDORS
Highest-activity road segments from the same GPS window — relative corridor intensity across Baku.
WAIT SPOTS
The most observed stopping clusters from the same GPS window — relative wait hotspots across Baku.
MINVOLT / OPERATING SYSTEM
Trips, assignments, swaps, payments and service activity are recorded and handled within one operational context.
Scheduled and event-driven operations
Operational history and automated processes
OPERATING FOOTPRINT
MinVolt officially launched on 1 July 2026. June testing is excluded from the four-month results. The live Dolu network state is shown below.
Official operations in Baku.
Network units connected to the live operational feed.
Stations currently available for a battery swap.
INTERNATIONAL CONTEXT
City infrastructure, institutional capital and commercial logistics provide distinct but converging signals for electric micromobility. These are not MinVolt results or partnerships.
Verified 23 Sep 2026Baku is expanding micromobility lanes, while New York has tested public battery access for couriers and is preparing a network.
of micromobility lanes in place
MinVolt is developing as Baku expands its urban micromobility infrastructure.
Primary source118 couriers · 6 months · 35% less at-home charging among participants.
Preparation for 25 locations; first installations planned for 2027.
plannedCities are evaluating battery access as courier infrastructure and a more controlled charging option.
Across different markets, investors have funded models that combine vehicles, energy access and an operating platform.
Zoomo combined vehicles, software, servicing and finance for commercial delivery in one offering.
A historical example of investor interest in integrated light-electric delivery services.Primary sourceAfrica Go Green Fund's total commitment after an additional US$18m. The investor reports 135,000+ motorcycles and 50m+ swaps.
Integrated vehicle and battery-swap networks can attract institutional finance for expansion.Primary sourceFinancing types, dates and markets differ. These figures are not MinVolt valuation, funding or a forecast of its results.
Large logistics networks are incorporating smaller electric vehicles and on-foot delivery into dense-city operations.
Micromobility has become a practical operating category in large-scale commercial logistics.
micromobility hubs
cities
The 30m figure includes electric cargo bikes, electric mopeds and on-foot delivery. Amazon is not a MinVolt customer or partner.
Primary sourceBACK TO BAKU
In Baku, these elements already run as one service: electric bikes, swappable batteries, maintenance and an operating platform.
The next step is to scale around measured demand.
Historical results cover 1 July–31 October 2026 using Asia/Baku calendar boundaries (123 days). Live counters reflect current operational data and can differ in scope.
Riding distance is estimated from validated GPS segments. Moving time measures recorded bike movement, not shift duration. Platform figures are period totals through 31 October 2026.